IM=X® Tower Certification

  • IMX Tower Step 1

 

The IM=X® Tower Program teaches instructors 10 sequences in either a 2-Day Intensive or via Skype over a series of sessions. IM=X Pilates Tower can be offered in workouts of 30-75 minutes or the formats can be combined with the Xercizer (reformer), Floor (mat), Ballet Bar and Cycle routines. There are sequences for lying supine or prone, sitting and standing. The focus of this course is learning the 10 sequences (39 sections of movement and exercises) and how to blend them into different workouts. The educational movie files of the routines must be studied prior to class attendance.

Length: 2 days (10:00 a.m. – 5:00 p.m.) | Can be learned via Skype.
Required Equipment: Rings, Mats, and Tower Units (WallTowerSpecifications.
Note: Shipped UPS ground in a box: 42″ L, 27 ” W, 5″ H, weight 25lbs)
Prerequisites: IM=X® Basic Certification | Practical Exam required

NEW – IM=X® Tower/Barre Program!

The IM=X® Tower/Barre routines are another unique program created by founder Elyse McNergney and found no where else! Fun and easy to learn – Tower/Barre adds resistance to grand plies and allows for a total body workout that everyone can do. Routines can be learned with an IM=X® Master Trainer in a 3-4 hour Skype session upon completing the Tower certification.

  • Tower/Barre Step 1

IM=X Wall Tower Installation Instructions

Note: These are general instructions for mounting. Please consult with a local contractor regarding details.

Step 1: Set out all of the components included in your IM=X Wall Tower shipment. Your IM=X Wall Tower is designed with mounting holes that are 16” apart so it can be secured into the wall studs. If your wall is NOT constructed with wood studs spaced 16” apart, make sure you have acquired the hardware necessary to attach the tower to your wall.

Step 2: To mount your IM=X Wall Tower on the wall, first measure from the floor up and put a mark at 8 inches from the floor. This is the distance from the floor that you want the bottom eye bolt to be set at. This will allow all of your routines to be performed correctly.

Step 3: Hold the IM=X Wall Tower at the desired height and have someone make sure the board is straight up and down. A level can be used across the top of the board to make sure the tower is mounted square. Mark at least the top 2 holes on each side and drill a 1/8” pilot hole into the studs on those marks.

Step 4: Insert the lag screws and washers provided, and using a wrench or socket then tighten the top 2 bolts into the wall studs. Repeat this step for the remaining mounting holes.

Step 5: There are some extra mounting holes at a width the same as the spring eye mounts. These can be used if there are no wall studs available if necessary.

Always check the eyebolts periodically to assure they are tight into the board.